 |
Town of Poland, Maine
Fees Schedule
Amended June 3, 2008
General Conditions
1) Administrative
A) The Selectmen shall set the fees. They shall review the schedule at one of their regular stated meetings. If there are changes to be made, they shall lie over until a hearing is scheduled after which the Selectmen may approve the new fee schedule and any amendments necessary.
B) The Selectmen shall review fee schedule at least once every two years.
C) All fees collected remain with the Town of Poland, and are not refundable unless otherwise noted in this schedule or the ordinance codes.
D) Refunds may be granted only after a review and approval by the Selectmen.
2) Code Enforcement & Planning Offices
A) Permit fees shall be rounded to the nearest dollar.
B) Permit fees shall to be tendered before any permit(s) is (are) issued.
C) Any construction projects started prior to obtaining a permit shall double the total permit fees.
D) Any construction project substantially completed prior to obtaining a permit shall triple the total permit fees.
E) Mobile and modular homes used as single family dwellings shall follow the same building permit fees as for the International Code Council’s R-3 “building use” and V-B “construction type”. (See Table 1)
F) Planning Board approved “phased” projects shall require individual and complete Building Permit fees for each phase.
G) Permit fees for Town of Poland municipal projects may be waived except for those portions of the fees for contract inspectors and for other government entities.
Fee Schedule February 2008 |
Administrative Fees |
|
~ |
~ |
~ |
~ |
Board Meetings – video |
$15.00 |
Per meeting – DVD |
Board Meetings – audio cassette |
$10.00 |
Per hour |
Copies – General |
|
~ |
Individual page – 8?” x11” & 8?”x14” |
$0.25 |
Each side |
Individual page – 11” x 17” |
$1.00 |
Each side |
FAX – First page |
$3.00 |
~ |
FAX – Additional pages |
$1.00 |
Each |
Hourly rate |
$16.00 |
Charged in 1/4 hour increments. |
First 15 minutes free. |
Ordinances – current copies |
$1.50 |
Per ten pages for complete ordinance |
Comprehensive Land Use Code |
$20.00 |
Each |
Comprehensive Plan |
$15.00 |
Each |
1-5 pages |
$1.25 |
~ |
6-10 pages |
$2.50 |
~ |
11-20 pages |
$5.00 |
~ |
21-30 pages |
$7.50 |
~ |
31-40 pages |
$10.00 |
~ |
41-60 pages |
$15.00 |
~ |
61 or more pages |
$20.00 |
~ |
Ordinances – old, non-current copies |
$0.25 |
Per page + hourly rate above |
Streets |
|
~ |
Guide – names only |
$1.00 |
Each |
Guide – length & cross roads |
$3.50 |
Each |
Road Map – 11” x 17” |
$1.50 |
Each |
Septic System – Copy of permit |
$1.50 |
Per system design |
Tax Assessing Office |
|
~ |
Commitment Book |
$35.00 |
Hardcopy each |
Commitment Book |
$15.00 |
Disk |
Deeds on file – first page |
$1.75 |
Each deed |
Deeds on file – additional pages |
$0.75 |
Each deed |
Tax card |
$0.50 |
Both sides each card |
Tax Map |
$1.00 |
Per page 11” x 17” |
Tax Map book |
$52.00 |
11” x 17” size |
Tax Map book |
$225.00 |
Large-scaled book – Must order in June |
~ |
|
~ |
Voter Registration List |
$25.00 |
Hard copy – 1 free to each political party in election year |
Voter Registration List |
$15.00 |
Disk |
Warranty Deeds |
$1.00 |
~ |
Vital records – certified copy, per page - Births, marriage, death certificates |
|
~ |
First copy |
$10.00 |
~ |
Additional copies on same day visit |
$5.00 |
Each |
Marriage License |
$30.00 |
~ |
Building and Use Permit Fees |
|
|
Type |
~ |
~ |
APPLICATION 1 |
~ |
~ |
Residential –new unit |
$50.00 |
Each application + fees as necessary below |
Residential – renovation or addition |
$50.00 |
Each application + fees as necessary below |
Commercial |
$50.00 |
Each application + fees as necessary below |
BUILDING PERMITS per Sq. Ft. Costs |
~ |
~ |
Residential, new |
~ |
~ |
Living Space (per square foot) |
$0.20 Table 1, Line R-3 |
See Table 1. Per Sq. Ft. Building Permit Fee Chart |
Non-Living Space |
Notes a, b, c. |
Table 1. Building Permit Fee Chart |
Addition, Expansion, Renovation, Relocate |
***** |
Follows same rules as non-residential below |
~Non-residential |
|
~ |
All other structures, new |
***** |
See Table 1. Building Permit Fee Chart |
Time extension of permit |
1/4 of new rate |
One 90-day period only. (application fee ONLY) |
Renewal of permit |
1/2 rate for new construction |
Must be applied for prior to the expiration of original permits. |
One renewal only. |
Expansion of structure |
***** |
Same as new construction |
Renovation of structure |
3/4 rate for new construction |
No expansion of floor space |
Relocation of structure |
1/2 rate for new const. |
For structures already located in Poland only. No alterations other than to fit new foundation. |
DEMOLITION |
|
~ |
Residential |
$35.00 |
Does not include any disposal fees, if required. |
Non-residential |
$0.07 |
Per ft2. Does not include any disposal fees. |
LANDSCAPING, OPEN SPACE |
|
~ |
Soil Disturbances |
$1.35 |
Per 1,000 ft2 for area greater than 5 times new or expanded portion of building footprint |
Soil Disturbances |
$2.75 |
Per 1,000 ft2 If no associated building permit. |
Swimming Pool – above ground permanently placed |
$0.11 |
Per ft2 Patios, decks, pool houses are extra. |
Swimming Pool – in ground |
$0.16 |
Per ft2 Patios, decks, pool houses are extra. |
Swimming Pool – portable, inflatable |
No fee |
Only for pools less than 20 feet in diameter and not over 36 inches deep. (Pool put away in winter.) |
Towers =< 100 ft above ground level |
$0.13 |
Per ft2 of tower area footprint 2 |
Towers > 100 ft above ground level |
$0.33 |
Per ft2 of tower area footprint 2 |
Towers, existing. Co-located Equip not inside a building |
$13.50 |
Per $1,000 value of equipment if not part of the initial build or |
Wells – Residential not in SLZ |
No Fee |
~ |
Wells – Commercial |
$70.00 |
< 10,000 gallons / day intended use |
Wells – Commercial |
$700.00 |
=> 10,000 gallons / day intended use |
SHORELAND ZONING DISTRICT |
|
~ |
Piers, Docks, Wharves, Bridges |
$0.70 |
Per ft2 |
Private Campsite |
|
Each |
Shoreline erosion control |
$1.35 |
Per ft. of shoreline. Does not include state fees |
Soil disturbances |
$0.07 |
Per ft2 (includes stump removal) Does not include state fees |
Timber Harvesting |
No fee |
|
Wells – residential in SLZ |
$35.00 |
If no associated “new building” permit |
USE |
|
|
Change of use |
? B. P. fee |
No renovation or expansion of structure(s). |
Change of use |
Standard B. P. fee |
With renovation or expansion of structure(s) |
Junkyard, et al. New &1st time |
$1.50 |
Per ft2 for outside storage + standard structure fees |
|
|
|
NOTES |
|
|
1.~~~~~~~~ Application fee shall be applied to each individual application or renewal of an original project permit. |
2.~~~~~~~~ Towers and other similar structures over 35 feet tall shall include as the footprint an area of radius that is 2/3 the structural height for the basis of its structure fee. If the tower uses guy wires, then the smallest circle that can be circumscribed around the outer guy wire anchors shall be
used to calculate the footprint for the structure fee. If any other structure is within the tower’s footprint, the structure fee for the first floor of the structure may be deducted from the tower fee if a separate structure fee is included in the permit. |
|
Board of Appeals Fe |
|
|
Residential Appe |
l $100. |
0 Ea |
h Non-residential Appe |
l $275. |
0 Ea |
h Additional notification |
$100. |
0 If delay is caused by applica |
|
|
|
Citation and Violation Fe |
s These are set in the CLUC and would need an amendment on the town warran |
. Schedule |
|
|
~ First Citation |
* $100. |
0 |
~ Second Citatio |
$200. |
0 |
~ Third Citatio |
$400. |
0 |
~ Fourth Citatio |
$800. |
0 |
~ Note: These penalties are cumulative |
|
|
~ Schedule |
|
Other Violation Fin |
s $100 - $2,5 |
0 Per day, and as described in Title 30-A M.R.S.A., Section 445 |
v~~~~~ Citation fees may also add expert or professional service fees needed to investigate any related violation(s) that results in a citation being issue |
. v~~~~~ Payment shall be in accordance with the Chapter 4 of the Comprehensive Land Use Cod |
|
|
|
Electrical Permit Fe |
|
|
·~~~~~~~~ Electrical Permit fees shall be split such that 25% of the fees are to be retained by the Town and 75% are to be paid to the contract Electrical Inspecto |
. ·~~~~~~~~ Minimum Fee charged shall be $25. |
|
|
Type of connecti |
n |
~ |
~ Single Phas |
Three phas |
Application in assoc. with Bldg. Perm |
t $15. |
0 $ 15. |
0 Application by itse |
f $30. |
0 $ 30. |
0 Service entrance – Tempora |
y $25. |
0 $37. |
0 Service entrance – Permanent overhe |
d $25. |
0 $37. |
0 Service entrance – Undergrou |
d $37. |
0 $62. |
0 Sub panels or load cente |
s $10. |
0 $18. |
5 Transfer Switches – Generato |
s $10. |
0 $18. |
5 Transformers & Vaul |
s $10. |
0 $18. |
5 Underground Junction box |
s $5. |
0 $7. |
0 Exterior sig |
s $10. |
0 $18. |
5 Exterior lighting not on bld |
. $5. |
0 $7. |
0 Furnace / water heate |
s $5. |
0 $7. |
0 Motors 3 hp and und |
r $5. |
0 $7. |
0 Motors over 3 |
p $7. |
0 $12. |
0 Control Panels – each permanent external power connecti |
n $7. |
0 $12. |
0 Elec. Equip. Hardwired =<2000 wat |
s $5. |
0 $7. |
0 Elec. Equip. Hardwired >2000 wat |
s $7. |
0 $12. |
0 Single & Duplex Receptacle =<125 v, 2 |
a $0. |
5 $0. |
0 Receptacles > 125 v, or > 20 am |
s $0. |
5 $1. |
5 Ground-fault & Arc-fault Receptacl |
s $0. |
5 $0. |
0 Switches (not control panels or breaker |
) $0. |
5 $0. |
0 Permanent Lighti |
g $0. |
5 $0. |
0 Minor Renovation, 1 new branch circuit with less than 8 outlets. Owner’s residence on |
y No Fe |
s Not Applicab |
|
|
|
Escrow and Expert Consultant Fe |
|
An additional fee may be charged if the Code Enforcement Officer, Planning Board and/or the Board of Appeals need the assistance of a professional surveyor, engineer or other expert. The applicant shall pay the expert’s fee in full within ten (10) days after the town submits the bill or estimate to the applicant. Estimates from the expert will be used to establish escrow amount whenever possibl |
|
Fire & Rescue: Unauthorized Burning1 & Unscheduled Non-emergency Ca |
|
s Ambulance respo |
se $75 |
00 Per h |
ur Tanker tr |
ck $120 |
00 Per h |
ur Engine tr |
ck $135 |
00 Per h |
ur Utility tr |
ck $110 |
00 Per h |
ur Rescue 1 (Heavy Du |
y) $200 |
00 Per h |
ur Firefigh |
er $25 |
00 Per hour/per |
on |
MT $25 |
00 Per hour/per |
on F |
am $85 |
00 Per p |
|
|
|
Note 1: Open air burning that does not have a permit prior to the start of the burn.
Flood Hazard Development F |
|
s Applicat |
on $250 |
00 Plus expert’s f |
|
|
|
Inspection Fees at Site Locat |
|
n Initial inspect |
on No char |
e |
~ First re-inspection because of initial inspection deficienc |
es $10 |
00 May be waived if other inspection(s) on site conducted at the same ti |
e. Subsequent re-inspecti |
ns $50 |
0 |
~
Late Charges, Insufficient Funds, and Interest F |
e |
~ Set at Annual Town Meet |
ng Set at Annual Town Meeti |
Interest fe |
|
~ Set at annual town meeti |
g~ Returned che |
ks $40 |
0 |
~
Licen |
es State Val |
|
s Auto Graveyard, Junkyard, Storage Lot > 100 feet from high |
ay $75 |
00 Per year per yard + posting & publishing costs (as per Title 30-A, Sec 3756 MR |
A) Auto Graveyard, Junkyard, Storage Lot <= 100 feet from high |
ay $300 |
00 Per year per yard + posting & publishing co |
ts Auto Recycling Busin |
ss $375 |
00 Per 5 years per yard + posting & publishing co |
t |
|
~ |
~ Liquor Lice |
se $75 |
00 Per y |
ar Business Registrat |
on $10 |
00 Per year (State statutes require all business to be registered with the to |
|
|
|
Mechanical Syst |
|
|
Applicat |
on $25 |
00 Plus fees be |
ow AC system – Portable (window mounted) AC not inclu |
ed $0 |
50 Per 1,000 BTU Input to sys |
em Chimney o |
|
y Application fee o |
ly Furnace o |
ly $1 |
00 Per 1,000 BTU input to sys |
em Complete HVAC sys |
em $1 |
25 Per 1,000 BTU input to sys |
|
|
|
Plumbing Syst |
|
|
A) Internal Plumbing F |
|
|
Minimum fixture fees 1 |
$10 |
00 Per fixtu |
e. Minimum application fe |
s $40 |
00 For 1 thru 4 fixtu |
es 1.~~~~~~~~ Each back flow valve is considered a fixt |
|
|
B) Subsurface Wastewater Disposal System Fees (Sewer Syste |
s) T |
pe Non-enginee |
ed Engineered (no chan |
e) Entire sys |
em $150 |
00 $250. |
0 Disposal Field o |
ly $125 |
00 $175. |
0 Tank o |
ly $60 |
00 $100. |
0 Holding T |
nk $125 |
00 N |
A Primitive sys |
em $125 |
00 N |
A Separate Laundry Fi |
ld $60 |
00 N |
A Seasonal Convers |
on $60 |
00 N |
A Variance (addition |
l) $25 |
00 $20. |
0 Alternative Toi |
et $60 |
00 $50. |
0
Portable or Temporary Storage Structures F |
es Struct |
re Up to 45 Day |
46 – 120 Da |
s Storage container or traile |
1 $5 |
00 $40 to |
60 Construction trailer - associated with a bldg per |
it No |
ee No |
Membrane structure >200 ft2. |
1 No |
ee $20 goes to |
30 Membrane structure <=200 ft2. |
2 No |
ee $10 goes to |
15 Unregistered or non-inspected (if normally required) trailer |
1 $ 15 |
00 $40 goes to |
60 1.~~~~~~~~ More than 364 days shall be $265.00 per year. Structure shall be considered continuously placed on the lot if not removed from the lot for more than 90 days after each placeme |
t. 2.~~~~~~~~ No fee if outside shoreland zoning districts |
|
|
3.~~~~~~~~ Instant structures (i.e. canvas garages, screen houses, shade tents) are structures and they must meet zoning requiremen |
s.
Road Entry and Construction |
|
es Applica |
ion $5 |
.00 Plus fees b |
low Culvert – Town insta |
led $25 |
.00 Plus cost of culvert + $20 per linear |
ft. Drive |
way $ |
.15 Per foot over if over 200 ft |
ong Minor repairs and mainten |
nce No |
fee No roadway size or location changes & no more than 12 cubic yards of earthen material involved per 100 feet of road |
ay. New roadway up to 2 lanes |
ide $ |
.25 Per foot for 0 – 10 |
ft New roadway up to 2 lanes |
ide $ |
.65 Per foot for 101 – 30 |
ft New roadway up to 2 lanes |
ide $ |
.30 Per foot for 301 – 1,00 |
ft New roadway up to 2 lanes |
ide $ |
.06 Per foot for over 1,00 |
ft Rebuild roa |
w |
y ? of new roadway |
ees Rebuild roadway to Soil Conservation District stand |
r |
s ? of new roadway |
ees
S |
|
|
s Applica |
ion $ 2 |
.00 Plus fees b |
low Permanent s |
gns $ |
.25 Per ft2 of area one side |
nly Replacements – sign area |
nly $ |
.10 Per ft2 of area one side |
nly Reloca |
ion $ |
.25 Per ft2 of area one side |
nly Directory signs (up to two locati |
|
s) Application fee |
nly Portable Signs < 90 |
ays $ |
.10 Per ft2 of area one side |
nly Temporary signs < 30 |
ays No |
e |
s ~ Governmental s |
gns No |
e |
s ~ Illuminated s |
gns Same as a |
ove Plus electrical |
ees
Site Review and Shoreland Zoning Review |
ees Type of |
f |
e ~ Units or Comm |
nts Application – sketch plans, Rough de |
ign $3 |
.00 Each application (no other fe |
s) Application – form |
l 4 $9 |
.00 Each application + fees b |
low Approval extension, Planning Board Approval |
nly $3 |
.00 One extension only (no other f |
es) Buildings / Structures 2,3, < 1,000 sq. |
ft. $12 |
50 Per 100 ft2 gross floor |
rea Buildings / Structures 2,3, 1,000 to 10,000 sq. |
ft. $5 |
00 Per 100 ft2 over 1,000 ft2 + $10 |
.00 Buildings / Structures 2,3, >10,000 sq. |
ft. $2 |
50 Per 100 ft2 over 10,000 ft2 + $45 |
.00 Escrow 1, minimum am |
unt $700 |
00 When required by Planning B |
ard Escrow 1, Struct |
res $5 |
00 Per 100 |
t2 Escrow 1, Groundwork & Landsca |
ing $1 |
00 Per 1,000 |
t2 Extension of appro |
al $100 |
00 Before approval exp |
res Auto graveyards, recycle busi |
ess $3 |
00 Per vehicle storage slot (parking sp |
ce) Junkyard, Storage |
ots $1 |
50 Per ft2 of outside sto |
age Major grounds improvements (soil filled, moved, removed) (Excludes structural foot pri |
t.) $1 |
00 Per 1,000 sq. |
ft. Minor grounds improvements (No soil disturbances) (Excludes structural footpr |
nt) $0 |
50 Per 1,000 sq. |
ft. Towers <=100 feet |
all $3 |
00 Per linear foot of tower height above ground l |
vel Towers > 100 feet |
all $15 |
00 Per linear foot of tower height above ground l |
vel 1.~~~~~~ Review Escrow Funds may be used by the Town to pay for professional reviews and advice requested by the Planning Board or Code Enforcement Officer, related to the applicants proposed development. Review escrow funds deposited by the applicant not spent during the course of the Towns review,
shall be returned to the developer within sixty days after the Planning Boards decision on the application is final. If professional review and advice fees exceed the amount deposited, the developer shall pay the amount outstanding before final approval or any permit is gra |
ted 2.~~~~~~ Building and Structures may include up to five times the footprint area of the building for grounds improvements, exclusive of the building footprint, as part of the building review |
ee. 3.~~~~~~ Building and Grounds Improvement Fees. The sum of these two fees may be limited to $2,500.00 per application at the discretion of the Planning Board. (Junkyards, a |
to graveyards, recycling business, and towers exclu |
|
d) 4.~~~~~~ Reduced Fees: The Planning Board may, upon application therefore, allow a reduced total site review fees to $50.00 in any case which it determines that the work for which the permit is sought will be performed within the Shoreland Zone. The
project shall be intended solely for the purpose of protecting a Great Pond, Stream, River, or other Natural Resources through the implementation of Conservation, Best Management Practices, or other environmental safeguards. Also, the project shall not result in the enlargement of any building or structure or an intensification of the existing use of the prope |
|
|
|
Subdivision Rev |
|
|
s |
y |
e |
~ ~ APPLICATION – Sketch p |
ans $6 |
.00 Each application. No other |
ees APPLICATION – Formal Minor p |
ans $20 |
.00 Each initial application + fees b |
low APPLICATION – Formal Major p |
ans $13 |
.00 Each initial application + fees b |
low APPLICATION – Required subsequent f |
rms No |
ees Includes final major application and submittal of myl |
rs Additional Notificati |
ns $17 |
.00 Delay caused by appli |
ant Amendment |
ee $17 |
.00 First division ch |
nge Amendment fee |
2 $13 |
.00 Second & third division ch |
nge Escr |
w 1 $22 |
.00 Per divi |
ion Extension of appro |
al $10 |
.00 Before approval exp |
res Publication & First Notifica |
ion $20 |
. |
0 ~ Planning Board Review |
Fee $50 |
.00 For first three divis |
ons Planning Board Review |
Fee $15 |
.00 Each division after t |
ree 1.~~~~~~~~ Escrow funds may be used by the Town to pay for professional reviews and advice requested by the Planning Board or Code Enforcement Officer, related to the developer within sixty days after the Planning Boards decision on the application is final. If professional review and advice fees exceed the amount deposited, applicants proposed development. Review escrow funds deposited by the applicant
not spent during the course of the Towns review, shall be returned to the developer shall pay the amount outstanding before final approval or any building permit is gran |
ed. 2.~~~~~~~~ If an applicant requests more than three division changes, not requested by the Planning Board, in his/her original application, all fees for a new application shall be paid again. Only escrow fees previously paid will count towards the new application f |
|
s.
Surface & Subsurface Excavation (Gravel & Borrow Pits |
Fees Fees shall include application fee plus renewal |
f |
e |
. ~ ~ Appli |
ation |
50.00 Plus fees |
below Renewal Fee – first 5 |
acres |
15.00 Per active acre due by March 31st of eac |
year Renewal Fee above 5 |
acres |
$7.50 Per active acre due by March 31st of eac |
year Late Renew |
l Fee |
ouble If fee is paid after March 31st of eac |
year Artificial ponds > 4,300 s |
. ft. |
15.00 Per 1,000 s |
. ft. New or five year |
eview |
35.00 Plus site review & renewa |
|
|
|
es
Transfer S |
|
t |
on ~ Use Permit S |
icker |
$2.00 Each Sticker pe |
year Tire Di |
|
o |
al ~ Passenger & light truck up to 16 |
nches $2.00 |
$3.00 Each un-rimmed tire Each rimme |
tire Commercial & Tires >20 |
nch |
s --- Not accepted at transfer s |
ation Heavy Equipment & Farm t |
act |
r --- Not accepted at transfer s |
ation Refrigerators, Freezers, & |
A/Cs |
15.0 |
Each Video Di |
|
l |
ys ~ Televi |
ions |
$0.0 |
Each Computer mo |
itors |
$0.0 |
Each Tanks & Cyl |
|
d |
rs ~ LP gas 2 |
lbs. |
$2.00 Each–if recyclable otherwise same as 3 |
lbs. LP gas 3 |
lbs. |
21.0 |
Each LP gas 10 |
lbs. |
25.0 |
Each Heavy duty – Indus |
rial |
25.0 |
Each Helium |
Tanks |
$6.0 |
Each Refrigerant can |
sters |
11.0 |
Each Fire Extingu |
shers |
15.0 |
|
|
ch ~ |
E
h
Zoning Ordinance |
|
a |
ge ~ Citizen initiated - no valid pe |
i |
i |
n ~ ~ Language Change - |
minor $1 |
0.00 Modify a subs |
ction Language Change - |
major $3 |
0.00 Add a subsection o |
more Map |
hange $5 |
0.00 Requires re-drawing zoni |
g map Table 1. Building Permit Structural Fee Chart – Price per Square Foot (Based on ratios for different ‘Uses’ and ‘Construction Types’ as provided by the International Code Cou
il) |
V-B $ |
0.403 $ |
0.353 $ |
0.276 $ |
0.271 $ |
0.350 $ |
0.238 $ |
0.271 $ |
0.235 $ |
0.259 $ |
0.132 $ |
0.1 |
6 N.P $ |
0.124 $ |
0.235 $ |
0.2 |
6 N.P $ |
0.285 $ |
0.256 $ |
0.188 $ |
0.285 $ |
0.226 $ |
0.200 $ |
0.256 $ |
0.121 $ |
0.115 $ |
0.129 $ |
0.103 $ |
0.147 $ |
0.2 |
0 V-A $ |
0.415 $ |
0.365 $ |
0.285 $ |
0.276 $ |
0.362 $ |
0.247 $ |
0.276 $ |
0.241 $ |
0.271 $ |
0.138 $ |
0.138 $ |
0.132 $ |
0.132 $ |
0.241 $ |
0.268 $ |
0.412 $ |
0.303 $ |
0.268 $ |
0.194 $ |
0.294 $ |
0.235 $ |
0.215 $ |
0.268 $ |
0.126 $ |
0.126 $ |
0.139 $ |
0.111 $ |
0.158 $ |
0.200 |
IV-HT $ |
0.462 $ |
0.412 $ |
0.324 $ |
0.321 $ |
0.409 $ |
0.300 $ |
0.321 $ |
0.297 $ |
0.321 $ |
0.271 $ |
0.179 $ |
0.174 $ |
0.174 $ |
0.297 $ |
0.318 $ |
0.468 $ |
0.353 $ |
0.318 $ |
0.235 $ |
0.344 $ |
0.285 $ |
0.238 $ |
0.318 $ |
0.171 $ |
0.165 $ |
0.154 $ |
0.123 $ |
0.175 $ |
0.200 |
III-B $ |
0.447 $ |
0.394 $ |
0.312 $ |
0.309 $ |
0.391 $ |
0.282 $ |
0.309 $ |
0.274 $ |
0.300 $ |
0.168 $ |
0.162 $ |
0.159 $ |
0.159 $ |
0.274 $ |
0.2 |
4 N.P $ |
0.329 $ |
0.294 $ |
0.224 $ |
0.321 $ |
0.262 $ |
0.229 $ |
0.294 $ |
0.153 $ |
0.150 $ |
0.148 $ |
0.118 $ |
0.169 $ |
0.200 |
III-A $ |
0.447 $ |
0.397 $ |
0.312 $ |
0.306 $ |
0.394 $ |
0.279 $ |
0.306 $ |
0.276 $ |
0.306 $ |
0.162 $ |
0.162 $ |
0.159 $ |
0.159 $ |
0.276 $ |
0.294 $ |
0.444 $ |
0.335 $ |
0.294 $ |
0.221 $ |
0.321 $ |
0.262 $ |
0.229 $ |
0.294 $ |
0.150 $ |
0.150 $ |
0.148 $ |
0.118 $ |
0.169 $ |
0.20 |
II-B $ |
0.476 $ |
0.426 $ |
0.335 $ |
0.329 $ |
0.424 $ |
0.312 $ |
0.329 $ |
0.309 $ |
0.335 $ |
0.188 $ |
0.185 $ |
0.179 $ |
0.179 $ |
0.309 $ |
0.318 $ |
0.479 $ |
0.365 $ |
0.318 $ |
0.247 $ |
0.347 $ |
0.285 $ |
0.241 $ |
0.318 $ |
0.176 $ |
0.174 $ |
0.156 $ |
0.124 $ |
0.177 $ |
0.20 |
II-A $ |
0.500 $ |
0.450 $ |
0.356 $ |
0.347 $ |
0.447 $ |
0.335 $ |
0.347 $ |
0.329 $ |
0.356 $ |
0.200 $ |
0.200 $ |
0.194 $ |
0.194 $ |
0.329 $ |
0.338 $ |
0.500 $ |
0.385 $ |
0.338 $ |
0.262 $ |
0.368 $ |
0.306 $ |
0.253 $ |
0.338 $ |
0.185 $ |
0.185 $ |
0.164 $ |
0.130 $ |
0.186 $ |
0.2 |
0 I-B $ |
0.512 $ |
0.462 $ |
0.365 $ |
0.362 $ |
0.459 $ |
0.350 $ |
0.362 $ |
0.341 $ |
0.365 $ |
0.215 $ |
0.209 $ |
0.206 $ |
0.206 $ |
0.341 $ |
0.347 $ |
0.512 $ |
0.397 $ |
0.347 $ |
0.276 $ |
0.376 $ |
0.315 $ |
0.262 $ |
0.347 $ |
0.200 $ |
0.197 $ |
0.169 $ |
0.135 $ |
0.192 $ |
0.2 |
0 I-A $ |
0.529 $ |
0.479 $ |
0.376 $ |
0.371 $ |
0.476 $ |
0.368 $ |
0.371 $ |
0.356 $ |
0.379 $ |
0.224 $ |
0.221 $ |
0.215 $ |
0.215 $ |
0.356 $ |
0.362 $ |
0.526 $ |
0.412 $ |
0.362 $ |
0.288 $ |
0.391 $ |
0.329 $ |
0.271 $ |
0.362 $ |
0.212 $ |
0.209 $ |
0.175 $ |
0.139 $ |
0.199 $ |
0.200 Descr |
ption Assembly, theaters, with |
stage Assembly, theaters, without |
stage Assembly, nigh |
clubs Assembly, rest., bars, banquet |
halls Assembly, ch |
rches Assembly, gen., comm. Hall, lib. |
mus. Assembly, |
renas Bu |
iness Educa |
ional Factory & industrial, moderate |
azard Factory & industrial, low |
azard High hazard, expl |
sives High |
aza |
d HPM Institutional, supervised envir |
nment Institutional, incapac |
tated Institutional, rest |
ained Institutional, day care faci |
ities Merc |
ntile Residential, |
otels Residential, multiple |
amily Residential, one and two |
amily Residential, care/assisted |
iving Storage, moderate |
azard Storage, low |
azard R-3 gar |
ges = R-3 Unfinished basements, porches, decks |
etc. R-3 Finished basem |
nts = Othe |
Uses Use |
Gro |
p A |
1 A |
1 A |
2 A |
2 A |
3 A |
3 |
A |
4 B |
E F |
1 F |
2 H-1 H-2 th |
u H |
4 H |
5 I |
1 I |
2 I |
3 |
I-4 |
M R |
1 R-2 R-3 |
& I |
C R |
4 S |
1 S-2 N |
te a. N |
te b. N |
te c. N |
t |
|
|
|
|  |